The long-awaited Mohali Kurali corridor opening is set to take place on December 1, 2025, promising a new era of connectivity and regional growth across Punjab and the Tricity region. The six-lane greenfield expressway stretching between Mohali IT City and Kurali is designed to decongest Airport Road and strengthen logistics links toward Himachal Pradesh and Jammu. Mohali Kurali corridor opening in 2025 promises faster commutes, better traffic flow, and major infrastructure development in the Tricity region.
Background and Purpose of the Mohali Kurali Corridor Opening
The Mohali Kurali corridor opening represents a crucial step toward solving the persistent congestion on Airport Road and the Kharar-Kurali stretch. Envisioned under the Punjab Regional Connectivity Plan, this greenfield project forms part of the broader PM Gati Shakti Master Plan aimed at integrating logistics and industrial zones through modern expressways.
Its main purpose is to:
- Provide a faster link between Mohali IT City and Kurali.
- Reduce heavy-vehicle load on NH-205 and PR-7 Airport Road.
- Stimulate economic activity by connecting industrial clusters around Kharar and Kurali.
For daily commuters and logistics operators, the Mohali Kurali corridor opening will translate to shorter travel times and improved safety standards.
Technical Details and Route Overview
The six-lane dual-carriageway corridor covers 30–31 km, beginning near IT City, Mohali, and ending at Kurali Junction, with interchanges and service roads for local access.
| Feature | Specification |
|---|---|
| Project Length | 30–31 km |
| Type | Six-lane dual-carriageway Greenfield Corridor |
| Key Junctions | IT City, Sector 82-83, Kharar Bypass, Kurali |
| Executing Authority | PIDB with NHAI Coordination |
| Expected Opening | December 1, 2025 |
| Trial Runs | November 29–30, 2025 |
Engineers have implemented smart-signage systems, storm-water drainage, and sound barriers to make travel smoother and quieter.
Construction Timeline and Current Status
Initially targeted for completion in April 2025, the project encountered hurdles related to land acquisition and utility shifting. Despite these issues, authorities have confirmed that the Mohali Kurali corridor opening remains on schedule for December 1.
Timeline at a glance:
- 2022: Groundwork and soil testing completed.
- 2023: Bridge and underpass construction begins.
- 2024: Asphalt layering and lighting installation.
- 2025 Nov: Final finishing, safety audit, and trial runs.
By late November, all pavement markings, safety reflectors, and landscaping will be finalized before the official Mohali Kurali corridor opening.
Why the Mohali Kurali Corridor Opening Matters for Chandigarh
For Chandigarh residents, the Mohali Kurali corridor opening means relief from the chronic congestion that plagues the Airport Road and Kharar bypass. Travel time from Sector 80, Mohali, to Kurali Junction will drop by nearly 40 percent, while freight movement toward Himachal and Jammu will be far smoother.
This project also strengthens the Tricity’s peripheral mobility network — integrating Mohali, Chandigarh, and Panchkula through seamless express corridors that align with Smart City objectives.
Economic Impact of Mohali Kurali Corridor Opening
The Mohali Kurali corridor opening is poised to reshape the economic landscape of the entire Tricity region. This ambitious infrastructure project will not only enhance transportation efficiency but also accelerate industrial growth and trade movement across Punjab.
With smoother connectivity between Mohali, Kurali, and Kharar, businesses can transport goods faster, cutting logistics costs by up to 30%. Industries located along the route — such as manufacturing, warehousing, and logistics — will benefit from reduced travel time and improved supply chain flow.
Moreover, small and medium enterprises (SMEs) in Mohali and nearby towns will experience better access to major highways and markets. The Mohali Kurali corridor opening will also attract new investments from industrial players who previously avoided the area due to heavy congestion on Airport Road.
Experts predict that once the corridor is fully operational, it could generate thousands of direct and indirect jobs, stimulate local businesses, and contribute significantly to Punjab’s GDP. Overall, this project is not just a road — it’s an economic engine driving growth across the region.
Mohali Kurali Corridor Opening and Real Estate Growth
The Mohali Kurali corridor opening is expected to trigger a real estate boom across its surrounding zones. Property developers, investors, and homebuyers are already showing growing interest in regions near the corridor due to improved accessibility and connectivity.
As traffic congestion eases, residential areas in Sector 82, Kharar, and Kurali are projected to witness a rise in property demand. Real estate experts forecast a 10–20% increase in land and property prices post the Mohali Kurali corridor opening, particularly near key intersections and commercial hubs.
Developers are planning new housing societies, retail spaces, and mixed-use projects along this route, catering to working professionals who seek quick access to Chandigarh, the Airport Road, and NH-205. The corridor’s modern infrastructure and smooth connectivity are also expected to attract IT companies and startups to set up satellite offices in the outskirts of Mohali.
In essence, the Mohali Kurali corridor opening will redefine the region’s real estate dynamics, transforming it into a preferred investment hotspot for both residential and commercial ventures.
Future Road Projects Linked with Mohali Kurali Corridor Opening
The Mohali Kurali corridor opening is part of a larger regional connectivity vision led by the Punjab and Chandigarh administration. Once this corridor becomes operational, it will complement other upcoming projects aimed at easing congestion and promoting sustainable travel across northern India.
Some of the most significant future projects linked with the Mohali Kurali corridor opening include:
- Mohali-Ludhiana Expressway: Connecting Punjab’s industrial capital directly to Mohali for seamless goods transportation.
- Kharar Flyover Expansion: Enhancing traffic flow from Chandigarh to Ropar via the corridor’s extended lanes.
- Smart Traffic Management Integration: Introducing AI-based signal coordination and surveillance for smoother vehicular movement.
These upcoming infrastructure developments will work in harmony with the Mohali Kurali corridor opening, ensuring uninterrupted connectivity from Chandigarh International Airport to northern Punjab districts. This integration will not only improve daily commutes but also strengthen tourism, trade, and regional growth potential.
In the long term, the corridor will serve as the backbone of Punjab’s evolving smart mobility framework — connecting cities, enabling industries, and supporting sustainable development.
Challenges and Delays in Execution
Despite the excitement around the Mohali Kurali corridor opening, the project has faced delays due to:
- Land-ownership disputes near Kharar bypass.
- Monsoon-season work slowdowns.
- Utility-line relocation and safety-compliance checks.
However, all major roadwork has been completed. Authorities confirm the corridor’s readiness after successful load and safety tests in early November 2025.
Trial Runs and Traffic Preparations Before the Mohali Kurali Corridor Opening
Trial runs scheduled for November 29 and 30 will test:
- Lane discipline and tolling operations.
- Traffic-management systems and emergency protocols.
- Signage accuracy and lighting efficiency.
Motorists are advised to follow temporary diversions during this phase. Once tests conclude, the Mohali Kurali corridor opening will commence with minimal disruptions for commuters.
Government Vision and Regional Significance
The Punjab Infrastructure Development Board and NHAI view the Mohali Kurali corridor opening as a model project that can inspire future six-lane developments in northern India.
According to officials, the expressway supports the PM Gati Shakti Mission by:
- Linking industrial clusters with freight hubs.
- Reducing travel time to Himachal Pradesh and Jammu region.
- Strengthening Punjab’s logistics competitiveness and urban growth.
This strategic corridor integrates economic activity along the Chandigarh–Ropar belt, a region expected to attract major logistics investments post-opening.
Frequently Asked Questions (FAQs)
Q1. What is the Mohali Kurali corridor opening date?
The official Mohali Kurali corridor opening is scheduled for December 1, 2025, with trial runs on November 29 and 30.
Q2. How long is the Mohali Kurali corridor?
It covers around 31 km, linking Mohali IT City directly to Kurali Junction.
Q3. Why was the project delayed?
Delays stemmed from land acquisition issues and shifting of utilities, though the project is now ready for commissioning.
Q4. How will it benefit commuters from Chandigarh?
The Mohali Kurali corridor opening will reduce travel time, decongest Airport Road, and improve connectivity toward Himachal Pradesh and Jammu.
Q5. Will there be tolling on this road?
Yes, the corridor will likely operate under a toll-collection system, with exemptions for local and emergency vehicles as per final policy.
Conclusion
The Mohali Kurali corridor opening marks a turning point in Punjab’s transport landscape. After years of planning and construction, this six-lane greenfield expressway is finally set to deliver tangible benefits — smoother traffic, economic uplift, and better inter-state connectivity.
From improving access to IT City, Mohali, to enhancing logistics routes toward Himachal and Jammu, the corridor represents a future-ready infrastructure investment aligned with India’s Gati Shakti vision.
As commuters prepare to drive this route for the first time, the Mohali Kurali corridor opening stands as a testament to modern engineering and a promising symbol of Punjab’s growth momentum.
Stay updated with Chandigarhut.in for ground-level reports and live coverage of the Mohali Kurali corridor opening ceremony on December 1, 2025.








